The piping put in so far has been pressure tested. More pipes are being installed in the Wenlock, and the floor is being replaced. The cast iron grates are back from their journey to a remote Yorkshire village foundry, good as new.  The cable ducts are delivered and being installed. The boiler is being installed in the boiler room, and the massive pipe connecting it to the church has been delivered.  The fan heaters (heat from hot pipes, but with an electric fan) are being installed. 

Delivery of the finned pipes is a bit delayed; pray for their speedy arrival so installation can begin.